dphase_isacmol: MOLOCH high-resolution forecasts driven by GFS forecasts run by ISAC-CNR for the MAP D-PHASE project

doi:10.1594/WDCC/dphase_isacmol

Davolio, Silvio et al.

ExperimentDOI
Summary
The forecasting chain is based on the 00 UTC, GFS forecasts at 0.5 degree resolution. The chain comprises the hydrostatic model BOLAM, which is driven directly by the global model, and the non-hydrostatic model MOLOCH (horizontal resolution 0.02 degrees), which is nested in cascade using a 1-way nesting procedure. BOLAM run starts at 00 UTC, MOLOCH is nested at 09 UTC.
MOLOCH domain is smaller than official DPHASE domain. A 39-h MOLOCH forecast is provided daily.
Only a sub-set of TIGGE list is provided (see DS).
More information available here: http://www.isac.cnr.it/~dinamica/

Grid description:
lat-lon Arakawa C grid. Rotated equidistant grid.
DDOM: xfirst: -2.69 yfirst: -1.84 xsize: 340.0 ysize: 290.0 xinc: 0.02 yinc: 0.02 xnpole: -171.0 ynpole: 44.7
Project
DPHASE (D-PHASE, Demonstration of Probabilistic Hydrological and Atmospheric Simulation of flood Events in the Alpine region)
Contact
Silvio Davolio (
 s.davolio@nullisac.cnr.it
)
Location(s)
D-PHASE region (DDOM)
Spatial Coverage
Longitude 2 to 18 Latitude 43 to 50 Altitude: 0 m relativ to NN
Temporal Coverage
2007-06-01 to 2007-11-30 (calendrical)
Use constraints
For scientific use only. No commercial use allowed. Please be aware of the common COPS/GOP/D-PHASE data policy (http://cops.wdc-climate.de/)
Data Catalog
World Data Center for Climate
Size
176.80 GiB (189834003835 Byte)
Format
GRIB1;records separated;bz2-zip, XML, tar of png
Status
completely archived
Creation Date
Cite as
Davolio, Silvio; Buzzi, A.; Malguzzi, P.; Drofa, O. (2009). dphase_isacmol: MOLOCH high-resolution forecasts driven by GFS forecasts run by ISAC-CNR for the MAP D-PHASE project. World Data Center for Climate (WDCC) at DKRZ. https://doi.org/10.1594/WDCC/dphase_isacmol

BibTeX RIS
Description
Missing data:
07 Jun 2007 (only forecast up to +22h)
13 Jun 2007 (only forecast up to +22h)
16-17-18 Jun 2007 pictures missing (grib data ok)
12 Jul 2007 (only forecast up to +10h)
13 Jul 2007 (only forecast up to +34h)
14 Jul 2007 (only forecast up to +33h)
02 Oct 2007 data missing (all data)
According to agreements within DPHASE data from timesteps not delivered in time could be missing. In this case a dummy file was created and inserted in the database.
Description
Summary:
Findable: 6 of 7 level;
Accessible: 2 of 3 level;
Interoperable: 3 of 4 level;
Reusable: 4 of 10 level
Method
F-UJI online v2.2.1 automated
Method Description
Checks performed by WDCC. Metrics documentation: https://doi.org/10.5281/zenodo.4081213 Metric Version: metrics_v0.5
Method Url
Result Date
2022-12-09
Description
Quality control:
- control of 'CERA UI Compact' metadata by author
- control of file transfer with check sum
- check of start and end date with qual.sh (APR 2009)
- check of number of data points with qual.sh (APR 2009)
- check continous time with cera_check.check_continuous_time.CHECK_EXPERIMENT (APR 2009)
Method
QA checklist manual
Method Description
Checks performed by WDCC and author.
Contact typePersonORCIDOrganization
-
-
-
-
-
-
-

Attached Datasets ( 8 )

Details for selected entry

Additional Info

Details for selected entry
[Entry acronym: dphase_isacmol] [Entry id: 2150485]