WCRP PCMDI BADC WDCC
QC History for cmip5/output1/MIROC/MIROC5/piControl

QC Results are available at: http://cera-www.dkrz.de/WDCC/CMIP5/QCResult.jsp?experiment=cmip5/output1/MIROC/MIROC5/piControl

Status Explanation:
QCL2_started: QC Level 2 checks are ongoing.
QCL2_assigned: QC Level 2 is assigned to the experiment.
QCL3_started: QC Level 3 checks are ongoing.
QCL3_assigned: QC Level 3 is assigned to the experiment and the data is DOI published according to the DataCite regulations [http://datacite.org/]. This data, its basic metadata and its DOI are persistent.
QCL1: The data of the experiment is withdrawn and waiting for a QC Level 2 check restart.

Last Change Revision of QC L2 Status Comment
2015-01-29T13:49:15 5 QCL3_assigned QC Level set to QCL3_assigned (2015-01-29 13:49:15 UTC): doi:10.1594/WDCC/CMIP5.MIM5pc [http://dx.doi.org/10.1594/WDCC/CMIP5.MIM5pc ]; QC Level2 assigned at 2012-06-07 06:03:31 UTC: QC L2 assignment confirmation from Koji Ogochi (16.05.2012) with announced data changes (v20120531)
2012-06-04T23:49:39 5 QCL2_started -
2012-06-04T23:49:39 5 QCL2_assigned QC Level2 assigned at 2012-06-07 06:03:31 UTC: QC L2 assignment confirmation from Koji Ogochi (16.05.2012) with announced data changes (v20120531)
2012-04-21T04:15:22 4 QCL2_started -
2012-03-12T17:05:39 3 QCL2_started -
2012-02-18T19:13:23 2 QCL2_started -
2012-02-14T12:58:55 1 QCL2_started -

Back to QC summary page...
This page is hosted at WDCC, please send technical inquiries to data@dkrz.de.